MORE INTERIOR PICTURES!

One thing we found out and I hope those that are still early in the process will take note of, Ryan does not put lighting in the bedrooms, if you dont buy a lighting package all you will get will be light switches.You have to get pre wires otherwise you will have to use lamps.

Thursday, April 12, 2012

PICTURES OF INTERIOR

Went by our home today , the interior is coming together all the doors are in place, and there was a second coat of paint on the walls.Also the tile in master bath is almost finished, things are moving along rather swiftly. On a side note a truck was out front spraying in the insulation in the attic of house. I talked with the guy that was running the insulation machine, he said of all the builders he does this for, Ryan uses the top end insulation. None of the other major builders here in Charlotte use that grade insulation, I forget what he told me about the specs,they run a hose into the attic and pump the insulation in. Pictures of banister, fireplace and master bath.

Sunday, April 1, 2012

LATEST PICTURES!

Latest picture of the exterior, and the four houses in our culdesac that are in different stages of the building process. So far there is a Martineque on one side,A Milan next door, differerent elevation, and a Kirkgate at the end of our street.